Any commercial installation or major repair.Īny new construction and any structural change or repair.Īny installation of vinyl siding (requires the contractor to hold a Specialty License). With holes, tear off fiberglass insulation and insert it into the hole as far as it will go. Use the paint scraper to scrape away caulk or paint. Pull out nails with the claw end of the hammer. Alarm - any new installation, and panel changes, and any additions to existing systems.Īlternate Energy Systems(AES, AEE, AEP, AEM)Īny installation or repair of solar, wind or other alternate energy system and supporting structures, wiring or piping.Įnsure that proper erosion control measures are taken when land is cleared so as to avoid sediment runoff onto adjacent properties and to reduce sedimentation of drainage systems and water bodies avoid the destruction of protected trees and ensure that required buffers are maintained.Īny removal or installation of a pollutant storage tank, to include foundation for above ground tank.Īny replacement or repair of more than 100 square feet for a residential project. The inner face of the window frame must be smooth to allow insertion of the replacement window. This method of using on PC works for Windows 7/8 / 8.1 / 10 / 11 and all Mac OS. To install Demolition Derby 3D on your Windows PC or Mac computer, you will need to download and install the WINDOWS PC APP for free from this post. Required for certificate of occupancy (new construction) and as required or requested for day cares, restaurants, etc. How to download and install Demolition Derby 3D on your PC and Mac. Dock and Seawall - any new construction and any structural change or repair.Īny installation, addition or major repair. Permit Requirements PermitĪny construction, remodeling, renovation, addition, moving or demolition of a building or structure. Access permit records for Bay County online.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |